销售员:赵元         订购热线:15531800576
广东绿滨垫厂家直销,绿滨垫是如何组装的,绿滨垫组装需要哪几部骤,绿滨垫的生态性,边坡防御绿滨垫,我们拥有技术精湛的技术人员,设备精良,工厂引进国外先进技术与设备,拥有国内最先进的生产流水线,技术指标达到国际同类产品标准,是现代河道水利工程防护材料的专业生产商!您给我们第一次信任,我们回您100%满意!
绿滨垫的安装:
1、将绿滨垫错缝摆设就位,避免出现纵向贯通缝
2、将绿滨垫四边立起,用绑线将相邻边沿锁紧,绑锁时,将绑线围绕两条重合的框线(缝合边棱时) 或框线与网笼的双扭结边(缝合格栅时) 螺旋状扭紧,避免重镀锌损伤,螺距不大于50 mm
3、当在已完成的底层网上面安装绿滨垫时,应用绑线沿新装雷诺护垫下部边框将其固定在底层的雷诺护垫上,同一层相邻的雷诺护垫也应用绑线相互系牢,使雷诺护垫连成一体
4、在某单元工程的同一水平层施工时,应将绿滨垫全部就位后才开始填充卵石,为了防止石笼网变形,相邻两个绿滨垫(包括同一绿滨垫垫的相邻格室) 的填石高差不应大于35 cm
5、绿滨垫安装前,应适当修整岸坡及地面,并尽可能保持岸坡原有形状,但不应有明显的隆起和凹陷
6、填充的卵石在河漫滩上选取,其抗压强度应满足设计要求,卵石粒径应在8~20 cm 之间,并要求大小搭配合理以达到设计要求的空隙度和保证绿滨垫的直线外形
7、在绿滨垫内填卵石时,外露面应用粒径不小于10 cm 的卵石,并用人工摆砌平整,以获得美观的表面和防止水流将卵石从网目淘走。应保证超填石料2. 5~3 cm 高,以便为沉陷留有余地
8、绿滨垫内填满石料后即将顶盖盖下,然后用绑线将两条重合的框线螺旋状扭紧,螺距不应大于50 mm 。
9、在砌筑好的绿滨垫上铺填10~15 cm的腐植土,以便植被生长。
 
Salesman: ychao order hotline: 15531800576
Guangdong green shore mat factory direct sale, green mat is how to assemble, green shore pad assembly which need several step, green shore ecosystem of the mat, shore slope defense green mat, we have skilled technical personnel, well-equipped, factory introduction of foreign advanced technology and equipment, and has the most advanced production lines, technical indicators have reached international product standards, is the professional manufacturer of modern river water conservancy engineering protection material! Trust you give us the first time, we are back to you 100% satisfaction!
The installation of green shore pad:
1, will be green shore break the decoration in place, to avoid the longitudinal penetration seam
2, the green shore pad set up four edges of bag, the adjacent edge locking with cable tie, tie lock, will tie line around two overlapping box line suture (edge) or frame line and double kink of mesh edge stitching (grating) spiral twist, avoid heavy galvanized damage, pitch is not more than 50 mm
3, when at the bottom of the completed online surface when installing green shore pad, application of tie line along the lower part of new Renault pads frame should be fixed in the bottom of the Renault pads on the same layer adjacent Renault pads used cable tie fastened to each other, become an organic whole repeatedly Renault pads
4, in a unit at the same level of the engineering construction, green shore pad should be after all in place began to fill the pebble, stone cage to prevent deformation, the adjacent two green shore pad (including the same green shore mat mat of adjacent lattice room) of rock fill height difference should not be greater than 35 cm